What should Reliability Coordinator B do if problems are expected to affect reliability due to a low voltage transmission line?

Prepare for the NERC System Operator Exam. Leverage flashcards and multiple choice questions with explanations. Get ready for your test!

The best action for Reliability Coordinator B in this scenario is to direct the operator of the low voltage line to open it. When transmission lines are experiencing low voltage conditions, it can indicate excessive current flowing through the line, which may lead to equipment damage, system instability, or even outages. Opening the line reduces the load on that segment of the network, mitigates the immediate risk of a reliability issue, and helps stabilize the overall grid.

While collaborating with adjacent Reliability Coordinators or conducting a risk assessment can be important parts of the reliability process, these actions do not provide an immediate solution to the pressing issue of low voltage on the line. Waiting for further instructions from Reliability Coordinator A would unnecessarily delay action that could prevent reliability problems, which is not advisable in emergency situations where timely decisions are crucial. By taking proactive steps to address the low voltage issue, Reliability Coordinator B ensures that they are minimizing risks to the grid's reliability and safety.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy